PLM for Garments & Apparel
StitchOptimaEnjen AI

From tech pack to dispatch — one thread.

From tech pack to dispatch — one thread.

Manage tech packs, samples, costings, and seasonal calendars on the same platform that runs your cutting room and shipment plan. No more parallel spreadsheets.

6 wks → 3 wkssample-to-PO median30%fewer fit cyclestech pack — one source of truth

Garments lifecycle

How garments products move through Enjen.

Stage names re-tuned to match how your operations actually run.

Stage 1 / 8

Concept

Ideation, briefs, and viability — captured in one place.

Capabilities

Built for the way garments actually works.

Tech Pack Management

A living tech pack — construction, measurements, BOM, and trims — with versioned changes that flow to vendors and production.

  • Graded measurements with size-set automation
  • Construction sketches and callouts with annotation
  • Trim cards and labels mapped to BOM lines

Sample Workflow

Proto → Fit → Salesman → PP sample stages with timestamps, comments, and decision logs.

  • Multi-round fit comments with measurement deltas
  • Photo and video annotations alongside spec data
  • Auto-trigger PP sample on PO confirmation

Cost Engineering

Costed BOMs with fabric, trims, CMT, freight, and duty — simulate margin impact of every spec change.

  • Per-style costing with what-if scenarios
  • Margin guard rails — alerts when below target
  • Multi-currency and duty-aware buyer pricing

Seasonal Calendar & Buyer Compliance

Drop dates, milestone gates, and buyer-specific compliance (Walmart, Target, H&M, M&S) tracked in one calendar.

  • Buyer-required tests (AATCC, ASTM) attached to styles
  • Restricted substances list (RSL) controlled per buyer
  • On-time delivery dashboards by buyer and country
"Our sampling team and merchandisers used to ping each other on WhatsApp for tech-pack updates. Now everything's one click away — fit comments, costing, vendor decisions. We shaved three weeks off our pre-production cycle."
GM, MerchandisingTier-1 apparel exporter, TirupurResult: Sample-to-PO cycle cut from 6 weeks to 3 weeks across two seasons.

Built for buyers, factories, and merchandisers.

See how Enjen PLM unifies your tech pack, sampling, and CMT in one platform.